Increased traffic volume, increased challenges
The load that today’s traffic inflicts on Holmenbrua in Drammen is much higher than what was originally predicted when the bridge was built in the early 1960’s. Due to a significant
increase in traffic volume,
examinations of the bridge’s construction was initiated to determine if it could withstand the burden it was exposed to or whether improvements were needed.
To
analyze the impact the increased traffic volume had on Holmenbrua’s construction, HBM was assigned by
Rambøll Norge to conduct the
necessary measurements on a given area of the underside of the bridge using
strain gauges. The strain gauges were attached to five longitudinal steel rods, or rebars, to log
tension and compression in the material by the passing of a
truck weighing 50 ton. For full exposure of the rebars and to get the best utilization of the strain gauges possible,
a part of the concrete around the rebars was removed.
“It was essential that the
surface of material where we attached the strain gauges was treated” says Herman Lingefelt, project engineer at HBM. “We do this to make sure the strain gauges provide the
correct measurements. Even wrong coarseness on the surface can result in the glue not transmitting the strain of steel correctly. In this case, we had to grind away the rust and then brush with sandpaper. It may seem simple, but it requires a lot of practical know-how.”
The strain gauges were adjusted to the environment in which they were to operate in, taking into consideration
temperature variations in the area. This was so that they would follow the
natural expansion and compression in the material caused by temperature. Because Holmenbrua is located in a
moist environment, HBM also used a
coating over the measuring points to prevent the gauges from losing their grip due to rust or short circuits in the steel.