This is an enormous challenge - especially since one of the bridges across the Nitra river is over 1 kilometer long. SHP performed static load tests on this bridge within 4 ½ days and, in addition with an external partner, dynamic tests that needed to be completed within half a day.
To enable this short time window to be optimally utilized, two SHP teams took measurements on the bridge 24/7. And, in addition: SHP was able to provide its contractor with a final analysis report directly the following morning after completion of the load tests.